Skip to content
ON CALL 24/7 · (408) 426-6140WINDSOR, CA · CA LIC #825594

INSIGHTS

Straight answers to cleanroom questions.

What the standards actually ask for, what makes a room fail certification, and how the work gets done. Written against the published standards, with every figure attributed to the body that sets it.

TESTING & CERTIFICATIONHow often should a cleanroom be certified?Typically annual under ISO 14644-1:2015, six months under USP 797 and EU GMP Annex 1, and any time the room changes.Read
STANDARDSISO 14644-1 class limits, explainedWhat an ISO class actually designates, why the table has blank cells, and what a complete classification has to state.Read
TESTING & CERTIFICATIONWhy cleanrooms fail certificationThe tests a room fails most often, what usually causes each one, and what happens after a failed result.Read
MICRO-CLEANINGThe top/down supercleaning checklistWhat a full reset covers that routine cleaning never touches, the ceiling-to-floor order, and why it runs before certification.Read
CONSTRUCTIONThe cleanroom construction protocol, start to finishThe phase sequence from dirty construction through handover, and the controls that hold at each boundary.Read
MICRO-CLEANINGHow to clean a cleanroom without relocating particlesStroke direction, wiper faces, and wetting: the technique details that decide whether particles leave the room or just move.Read
TRAININGGowning procedure, step by stepWhat a gowning procedure has to accomplish, how the order is reasoned, and why your site SOP governs the exact steps.Read
CONSTRUCTIONKeeping a cleanroom clean while you buildWhat gets refused at the door, badges tied to training, and daily counts that show what is loading the room that day.Read
CONSTRUCTIONTool move-in, step by stepDock to placement: condensation control, wipe-down at the boundary, and the re-testing a tool move-in triggers.Read

Tell us about your environment.

Walk us through what you run and the standard the room has to hold. We'll come back with the right plan for the job, usually within one business day.